Our civil engineering team constructed a fully equipped workers’ camp to support a large oilfield project. The work included earthworks, prefabricated buildings, steel structure fabrication for workshops, water supply and sewage systems, roads, fencing, and boundary walls. All installations were completed according to international standards, ensuring safety, comfort, and durability for on-site personnel.
Execution of pipeline construction works, including alignment, welding, installation, and testing, in compliance with project specifications and operational requirements.
Completion of pipeline works at the WQ2 site, covering full mechanical scope from site preparation through to installation and commissioning readiness.
Our mechanical team executed the fabrication and installation of multiple piping skids and flowline systems for a new production platform in Zubair Oil Field. The project included valve removal and replacement, manifold erection, and platform support structures. All works were completed according to client specifications, ensuring high safety standards while minimizing downtime during commissioning.
Provision of skilled manpower to support shutdown activities from the station level through to Central Processing Facility 1 (CPF-1), ensuring safe, efficient, and timely execution.
Execution of rig move services for Great Wall Company, transporting equipment from the designated zone to B10 in Samawaha, utilizing appropriate heavy machinery and logistical planning.
Procurement and supply of critical instrument spare parts for the Separation and Production Facility (SPF) in Block B9, sourced from reputable international manufacturers to ensure operational continuity and quality compliance.
M.T.C provided comprehensive logistics support for a drilling rig relocation in West Qurna. Our team supplied heavy machinery, including cranes, excavators, and transport vehicles, along with skilled operators. We coordinated site preparation, equipment transport, and installation, ensuring the move was completed on schedule and safely. This project demonstrated our ability to manage complex logistics in challenging field conditions.
Along with METTITO chemicals, M.T.C successfully supplied a range of oilfield chemicals to support drilling and production operations in the Rumaila Oilfield. This included drilling fluids, additives, and rig wash chemicals. Our technical team provided on-site support for mixing, handling, and application, ensuring optimal performance and compliance with safety standards. Additionally, we carried out chemical cleaning and hydro-testing of key pipelines, improving operational efficiency and extending equipment life.
M.T.C is an authorized agent and representative for METITO in Iraq. Through these strategic partnerships, we ensure direct supply channels, competitive pricing, and full technical backing for all supplied products.
M.T.C operates a fully equipped fabrication yard with an approximate area of 1,000 m², designed to support structural steel fabrication, piping works, equipment assembly, and material preparation activities. In addition, the company maintains a large operational workshop located in Artawi R.O.O (Rumaila Oil Field) covering approximately 5 acres, strategically positioned to serve oil and gas field operations. The facility is equipped to handle heavy-duty fabrication, maintenance works, storage, and logistics support, ensuring efficient project execution, fast mobilization, and high-quality production standards in compliance with industry requirements.